Toll/Program/Project Management

TxDOT Austin District – General Engineering Consultant

District’s US 183 North $500 million project, a 9-mile corridor in northwest Austin, by providing professional project management services, coordinating project development activities, and providing construction oversight.

Ramos Consulting LLC TxDOT Austin District project photo of median and 2 highway roads
Fort Bend County Toll Road Authority
Toll Consultant
  • Toll system evaluation/conversion for Westpark Tollway and Fort Bend Parkway
  • Toll Gantry Design for Westpark Tollway and Fort Bend Parkway
  • Toll conversion construction oversight for Westpark Tollway and Fort Bend Parkway
Fort Bend County Toll Road Authority Toll Road
Fort Bend Grand Parkway Toll Road Authority - Toll Consultant
  • Development of Tolling Policy and Business Rules
  • Procurement documents for system integrator and violation processing services
  • Oversight for implementation of tolling equipment and violation processing center
TxDOT Houston District - General Engineering Consultant

District’s Grand Parkway $5.3 billion project, a 180-mile corridor responsible for the completion of the Grand Parkway, also known as SH 99, by providing professional project management services and coordinating project development activities, such as:

  • Financial Plan Analysis
  • Environment​al Coordination
  • Public Involvement
  • Schematic Design
  • Right of Way 
  • Construciton Phase Services 
  • Procurement Services 
  • Develop Engineer’s Report 
  • Support Toll Revenue Bond Sale 
  • Support TIFIA Process

Procurement Experience

I-2/I-69C Interchange, TxDOT Strategic Contracts Management – Procurement Engineer

Responsible for developing/evaluating the corridor to establish feasible improvements to be delivered under a Design-Build Contract. Scope of work consists of:

  • Schematic Development
  • Environmental Document
  • IAJR and RFP Documents
Ramos Consulting LLC I-2/I-69C Interchange arial photo
Grand Parkway Segments F & G TxDOT Houston District – General Engineering Consultant

Responsible for developing/evaluating the corridor to establish feasible improvements for this corridor as a P3 design-build project. Scope of work consists of:

  • T&R Studies
  • Schematic Development
  • Environmental Document
  • RFP Documents
  • Project Development Agreement with Tolling Agency
Ramos Consulting LLC Grand Parkway Segments arial photo
SH 249 Extension, TxDOT Strategic Contracts Management - Procurement Engineer

Responsible for developing/evaluating the corridor to establish feasible improvements to be delivered under a Design-Build Contract. Scope of work consists of:

  • T&R Study
  • Schematic Development
  • Environmental Document
  • RFP Documents
SH 71 Toll Lanes Project, TxDOT Strategic Projects Division – Procurement Engineer

Responsible for developing/evaluating the corridor to establish feasible improvements for this corridor. Scope of work consists of: T&R Conceptual Study, schematic development, environmental document, RFP documents, and Project Development Agreement with Tolling Agency.

Energy Sector Roadway Repair Projects, TxDOT Strategic Projects Division – Procurement Engineer

Responsible for developing/evaluating thirty-one potential projects that make-up this P3 project. Scope of work consists of: Developing/coordinating cost estimates, conducting due-diligence reviews, risk assessments, developing shadow-bid, reviewing environmental document, and RFP documents.

Preliminary Engineering & Design Experience

I-35 NEX, TxDOT San Antonio District

Developed traffic control layouts for proposed 19-mile corridor, between I-410 South to FM 1103. Improvements consist of: main lane reconstruction and widening, new overpasses, elevated express lanes, and new interchanges at I-35/I-410 and I-35/Loop 1604.

Loop 1604, TxDOT San Antonio District

Developed schematic design for existing 3.8-mile corridor, taking divided 4-lane roadway to access-control roadway with frontage, ramps, and direct connector. Designed horizontal and vertical geometry, signing and striping, and prelim bridge layout.

FM 723, TxDOT Houston District

Developed schematic design for existing 9-mile corridor, taking 2-lane roadway to a divided 4-lane roadway with multiple intersections. Designed horizontal and vertical geometry, signing and striping, and prelim bridge layout.

Clients

Atkins North America, Inc. 

C&M Associates, Inc.

Doucet 

Garver

Gunda

HNTB

Jacobs 

LJA Engineering 

Pape-Dawson

RS&H

SAM-CS

TxDOT Houston District

TxDOT Laredo District

TxDOT PDF-SCM

Contact Our Team

Ramos Consulting has a wide range of experience providing services for reconstruction and new construction of highways, toll roads, and local arterials in project management, consultant oversight, agency coordination, preliminary engineering, and final design.